A. Turn on the air conditioning 4h in advance to make the workshop reach the specified temperature and humidity, and turn on the workshop lighting;
B. Turn on the machine power 4h in advance, preheat the machine, and check whether there is any abnormal sound;
C. Check machine oil temperature and computer data setting;
D. First run slowly for several times, check and adjust the comb needle distance (the comb of cold car is generally inclined to the nose), and reduce the speed of express car by 1/3;
E. Check the tension of yarn and cloth surface. After entering the express train, observe the cloth surface at any time, listen to the sound of the machine and check the temperature of the machine:
F, normal operation more than 30 rnin. Then restore the machine to the specified speed, continue to pay attention to the operation of the machine, and correct the needle distance of the comb again;
G. There are too many machines in the workshop. According to the principle of easy first, difficult machines are put into the last processing:
H. Check and check the data of the process machine, and make the operation record of the machine.
2.1 Check, check and record the production process to check the specifications of coil head yarn. Measure let-off quantity, machine density, needle width, grey cloth width, check machine speed, fixed length, yarn quality, yarn path, yarn threading mode, each pair of yarn, etc.
2.2 Check, check and record machine cloth surface
Check cloth edge treatment, horizontal strip, vertical strip, wool needle, wool silk, pattern effect, clear cloth, pollution, other defects, shift marking, falling marking and grey cloth stacking, etc.
2-3 Check apricot, check and record the production environment
Including workshop temperature and humidity, workshop cleanliness and hygiene, 1: appliance form placement, etc.
2.4 Collect data related to production assessment
Collect machine production record sheet and code copy sheet. Collect warping personal quality data and thorium head quality tracking records. Rectify on site and make relevant records.
3.1 Check, check and record the blank inspection process
Check identification card, blank cloth name, blank cloth code, defect jack {don't, sample check blank cloth quality, defect record statistics, fabric inspection speed, defect repair, sample check missed inspection, packaging label, etc.
3.2 Collection of personal quality data for warp editing
Collect the defect records of the gear shifter and preliminarily analyze the quality reasons. Take corrective actions on site and record and feedback.
Collect and sort out the technical data of crystal, including: product number, production date, customer information, dyeing and finishing manufacturer, sealing sample, gram quality, horizontal density, vertical density, record filing.
Make daily production quality report of warp knitting, daily production quality report of warping, machine cleanliness check list, process machine check list, staff operation measurement table, quality feedback table, etc.
On-site inspection of the whole process of cattle production includes: measuring operation methods, correcting errors in cattle production, recording field data, analyzing the causes of errors, reporting processing results, and cooperating with new product development.